The new maintenance facility for the NGR trains at Wulkuraka required assessment of all walking, climbing and work surfaces in regard to compliance with standards and control of slip and fall risks. Assessment including sample slip testing as per AS/NZS 4663 using the...
The work performed by Ergowork included analysis of various laboratory tasks involved in testing and analysing for water quality and forensic purposes. The design of workstations, benches, tools to assist certain repetitive tasks and assisting by way of workplace...
As part of the Pluto gas project Woodside Petroleum commissioned Peter Hunt Architects to design a state of the art remote connect and control centre to allow technical staff, based in Perth, to liaise and meet via videlinks with staff at the Karratha site. Ergowork...
The New Generation Rollingstock project for QR involved examining, reviewing and providing recommendations for various aspects of cab design related to controls, displays and sightlines. The aspects examined and advised on included the layout of the driver’s control...
This work was done for Aecom and included reviewing architectural drawings, setting out sightlines and room layout and ensuring planned layout and viewing distances, lighting and fields of view accorded with standards. Recommendations for console design were also...
Recent Comments